Review

Revision 1 as of 2011-06-14 17:46:34

Clear message

Pre-upload review procedure

Before uploading a package to the ARB PPA, the ARB member should quickly go through this checklist to make sure not to miss anything:

* Make sure the screenshot/icon branch has been merged and published (can take a while). * Look for typos in the packaging, one that we missed was a typo in the Screenshot or Icon name * Make sure the version number is consistent with: <upstream>-0extras<release.X where X starts at 1 with the first upload. Example: 1.2.3-0extras11.04.1 for the first upload of a package with the upstream version 1.2.3 * Merge changelog entries to only have one entry per upload to the extras PPA * Triple check the target distro * Run lintian on both source and binary package one last time * Upload to the PPA. Make sure it builds fine and that it then shows up on extras.ubuntu.com (within 24 hours). * Check in Software Center that it shows up properly and installs fine. * [OPTIONAL] Blog about it