Line 10: Line 10:
||update the 3 routers already at EPC||deinerson1|| ||update the 3 routers already at EPC||deinerson1 - Done||

Items or resources needed

The next action date for the EPC project is 2/7/08 We need the following resources:

resources needed

responsible party

spool cat5

?

Double sided sticky Velcro

David Thomas

light, power extention cords

jimrz

update the 3 routers already at EPC

deinerson1 - Done

find a suitable location in the NW and SE sections of the main building

deinerson1

determine which 2 rooms will get a router

deinerson1

measure current signal details using wavemon in key locations

deinerson1

The next action date for the EPC project is 3/1/09 Items on the agenda include the following.

  • Changed the number of repeating routers to 2, as this is what we are going to try first and add more as needed.
  • Also removed some of the items that were from the lab setup.