Items

Differences between revisions 17 and 18
Revision 17 as of 2009-01-26 20:39:57
Size: 930
Editor: 65
Comment:
Revision 18 as of 2009-01-27 06:50:02
Size: 949
Editor: c-68-35-135-32
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
||update the 3 routers already at EPC||deinerson1 - Done|| ||update the 3 routers already at EPC||deinerson1 - '''Done'''||
Line 13: Line 13:
||measure current signal details using wavemon in key locations||deinerson1|| ||measure current signal details using wavemon in key locations||deinerson1 - '''Done'''||

Items or resources needed

The next action date for the EPC project is 2/7/08 We need the following resources:

resources needed

responsible party

spool cat5

?

Double sided sticky Velcro

David Thomas

light, power extention cords

jimrz

update the 3 routers already at EPC

deinerson1 - Done

find a suitable location in the NW and SE sections of the main building

deinerson1

determine which 2 rooms will get a router

deinerson1

measure current signal details using wavemon in key locations

deinerson1 - Done

The next action date for the EPC project is 3/1/09 Items on the agenda include the following.

  • Changed the number of repeating routers to 2, as this is what we are going to try first and add more as needed.
  • Also removed some of the items that were from the lab setup.

Endorphin_Power_Company_Ubuntu_Install_and_Support/Items (last edited 2009-06-03 03:06:53 by c-68-54-8-56)