PointReleaseProcess

Differences between revisions 61 and 62
Revision 61 as of 2013-08-20 17:23:10
Size: 8065
Editor: vorlon
Comment: update the instructions for current codebase
Revision 62 as of 2013-08-20 17:27:18
Size: 8011
Editor: vorlon
Comment: only the crontab needs edited now to build from -proposed \o/
Deletions are marked like this. Additions are marked like this.
Line 30: Line 30:
 1. Change `cdimage/bin/run-germinate`, `debian-cd/CONF.sh`, and the cdimage crontab to build from -proposed temporarily.  1. Change the cdimage crontab to build from -proposed temporarily.

To be carried out by: nominated stable release manager, with support from the stable release updates and release teams

Goals:

  • Refresh hardware support in LTS releases for carefully-selected hardware
  • Roll up accumulated stable updates into updated images to reduce download requirements for new deployments
  • Maintain stability of existing installations

Note that, unlike the big releases, we don't push point release images to the CDN, so there's no need to coordinate this with IS.

Between Release minus 6 months and Release minus 2 months:

  1. Discuss candidates for new or improved hardware support with affected parties. Some sources for this work should be:
    • the Canonical support team (via Steve George)
    • customers
    • the Ubuntu kernel team
    • the Ubuntu QA team
  2. Establish a hit-list of bugs to fix in the point release using a milestone. Milestoning bugs is not a commitment to including the changes in the point release; they may be deferred after further information becomes available.
  3. In concert with affected developers, triage the hit-list for feasibility.

Release minus 2 months:

  1. Process stable release updates as normal. For hardware-enabling fixes, the package should be tested on the affected hardware prior to submitting to sign-off for -proposed.

  2. Discuss the possibility of a Canonical press release for the point release with marketing.
  3. Liaise with IS, QA, community and certification to arrange for testing resources.
  4. Canvas OEM and Support organizations for any bugs important to try to get fixed.

Release minus 1 month:

  1. In coordination with QA, verify that all candidate bugs are fixed.
  2. Upload a new base-files package to -proposed to bump the lsb_release description (example for 8.04.4). Do not change the DISTRIB_RELEASE value, which is used programmatically by third-party software. If the etc/os-release file exists, update VERSION and PRETTY_NAME, don't update VERSION_ID.

  3. If the kernel or associated modules have been changed, upload debian-installer after all the binaries are in place. If the ABI changed, make sure to take account of this throughout debian-installer/build/config/ and in the installer seed for all flavours being built.

  4. Change cdimage/lib/cdimage/config.py and debian-cd/CONF.sh to use the new release version number.

  5. Change the cdimage crontab to build from -proposed temporarily.
  6. Update the manifest to reflect publishing status of images based on input from product leads.
  7. Build CD images (which will be published on cdimage.ubuntu.com) and smoke-test in some convenient environment to check for obvious failures.
  8. Notify translations-team to prepare updates for point release.

Release minus 3 weeks:

  1. Notify Evan Dandrea to update umenu and wubi for the point release.
  2. Include the latest translation updates into the sources for the point release.
  3. Contact IS, QA, and/or certification as appropriate to request testing for hardware recertification.
  4. Iterate CD images as needed based on testing feedback, in coordination with the kernel team.

Release minus 14 days:

  1. Prepare change summary and release announcement
    • Script to use for preparing the change summary: http://people.canonical.com/~cjwatson/precise-updates.py

    • Divide updates into rough categories (see previous summaries)
    • Remove administrative-only bugs (e.g. kernel release tracking)
    • Try to reduce each entry to just a description of the change; remove redundant bug references and information about where the change came from (people can go to the raw changelog if they care)
    • This can involve substantial amounts of editing; make sure you have a good editor and/or a clear grasp of regular expressions
    • If this is the final point release for the distroseries (because a new LTS will be released soon), include a reminder of this and of the support cycle/EOL

Release minus 7 days:

  1. Once testing is verified to be complete, move packages to -updates.
  2. Turn off cron jobs that will auto update into -updates until final images are tested.
  3. Build candidate release images and populate into iso tracker.
  4. Notify OEM team (irc: KyleN) to build found license list for main.
  5. Notify web team of the upcoming point release.
    • Determine who from the team the publishing contact will be.
    • Include summary list of actual file names of ISOs that will make up releases.
    • Include detailed information about which image file names will change on the mirrors for the point release, and which ones will not.
    • Discuss release stability and handoffs on release date.

Release minus 3 hours:

  1. Check with James Troup whether the previous point release needs to be moved off before prepublishing due to mirror space constraints.
  2. Pre-publish images: ./publish-image-set --prepublish will print the necessary commands.

  3. Copy .manifest to .manifest.full, and prune all images from previous releases from the .manifest file to allow timely mirror probing.
  4. Run sync-mirrors on nusakan to push out the pre-published file structure.

Release:

  1. Release images as final, and move the previous images to old-releases.ubuntu.com:

    • Archive the old copy of wubi.exe to old-releases, and publish a new one (do this first so that its timestamp will be newer than that of the checksum files so that the checksums will be updated properly)
    • Find which previous images on cdimage.ubuntu.com for this release are going to be replaced by this image set, and archive them to old-releases (using a similar procedure to that in EndOfLifeProcess for moving images from cdimage.ubuntu.com to old-images, but leave /srv/cdimage.ubuntu.com/www/full/netboot/RELEASE/ alone).

    • Publish images: ./publish-image-set.py will print the necessary commands.

    • Update version numbers in cdimage/www/simple/HEADER.html and cdimage/www/simple/.htaccess.

    • Archive releases.ubuntu.com images from the previous point release to old-releases (using a similar procedure to that in EndOfLifeProcess, but being more selective about which files to move).

    • Copy .manifest to .manifest.full again, pruning all images from previous releases from the .manifest file to allow timely mirror probing.
    • Run sync-mirrors on nusakan to push out the published file structure.
    • Notify Web team to update the iso URLs on the ubuntu.com website
  2. Create a snapshot of the archive:

    ubuntu-archive@lillypilly:~$ point-release-snapshot lucid lucid.3-security-updates-snapshot

    which will copy the relevant indices to a subdirectory of ~ubuntu-archive/point-releases/. (Packages may be retrieved from the Launchpad librarian if required.)

  3. Ping bdmurray to update meta-release file on http://changelogs.ubuntu.com/

  4. File a bug on ubuntu-docs to have https://help.ubuntu.com/community/UbuntuHashes updated.

  5. Work with release and web publishing team to monitor mirror pickup
    • verify download from ubuntu.com
    • check that the torrents are working
    • verify download from one of the mirrors
  6. Send the announcement mail (see archives for past examples)
    • ubuntu-announce
    • ubuntu-release
  7. Notify press release team if needed

Release +1 day:

  1. Restore the .manifest.full file on releases.ubuntu.com
  2. Deactivate the just released "point release" milestone target
  3. Re-enable daily builds
  4. Send out update to people running previous LTS (after migration testing completed).
  5. Get final summary of updates for release (see precise-updates.py script), and publish to ???
  6. Gather feedback info for future improvements to process