Unity8
Differences between revisions 28 and 29
1686
Comment:
|
2125
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* Make sure you have set a commit message. Commit messages should have the following format * A single-line summary or short description of the change (something no longer than 80 or 90 chars) * An empty second line (if you're going to have a long description). * A long description, if needed. Where you describe what changed and explain why it changed. |
|
Line 20: | Line 24: |
* Ensure the commit message has the proper format (see above) |
MP Submission Checklist Template
Note: Please ensure you include the following form filled out and submitted along side your code to the MP ticket.
- Answers to checklist questions are desired to be 'yes' but if 'no' or 'not applicable' please expound
Copy & paste the checklist into MP description
Use strip-u8-tags.py if applicable
- Make sure you have set a commit message. Commit messages should have the following format
- A single-line summary or short description of the change (something no longer than 80 or 90 chars)
- An empty second line (if you're going to have a long description).
- A long description, if needed. Where you describe what changed and explain why it changed.
- Questions to answer:
* Are there any related MPs required for this MP to build/function as expected? Please list. * Did you perform an exploratory manual test run of your code change and any related functionality? * Did you make sure that your branch does not contain spurious tags? * If you changed the packaging (debian), did you subscribe the ubuntu-unity team to this MP? * If you changed the UI, has there been a design review?
MP Review Checklist Template
- If you have been asked to review and are not on the unity-team, please review for any interdependency and paste the associated MP reference in a comment
- Ensure the commit message has the proper format (see above)
Copy & paste the checklist into MP review comment
- Questions to answer:
* Did you perform an exploratory manual test run of the code change and any related functionality? * Did CI run pass? If not, please explain why.
MP Landing Checklist Template
- Questions to answer:
- Is the MP approved by at least 1 member of unity-team?
- Are the approvals equal to or greater than the disapprovals?
- Is the checklist completed to satisfaction?
Has the TestPlan been executed successfully on emulator, N4?
Process/Merges/Checklists/Unity8 (last edited 2017-03-28 21:55:58 by saviq)