= Activities Planner and QQ Release Schedule =
 * '''Period:''' QQ (12.10) Development Cycle (May to October 2012).
 * '''Start date:''' Release date of Precise Pangolin (26th April 2012).

= Activities Planner and Development Release Schedule =
 * '''Period:''' RR (13.04) Development Cycle (October 2012 to April 2013).
 * '''Start date:''' Release date of Quantal Quetzal (18th October 2012).
Line 9: Line 10:
Line 10: Line 12:
||<rowbgcolor="#cccccc"> '''Week''' || '''Date''' ~-(Thursday)-~ || '''Work Item Iteration''' || '''Status''' || '''Notes''' ||
||<-5 #eeeeee> May 2012 ||
|| 1 || May 3rd || A-2 ||<#CCFFCC> || <!> Toolchain Uploaded ||
|| 2 || May 10th || A-2 ||<#CCFFCC> || {*} '''Developer Summit''' ||
||<rowbgcolor="#cccccc"> '''Week''' || '''Date''' ~-(Thursday)-~ || '''Work Item Iteration''' || '''Status 13.04 Events''' || '''Notes''' ||
||<-5 #eeeeee> October 2012 ||
|| 1 || October 25th || ||<#CCFFCC> <!> Toolchain Uploaded || ||
||  || October 29th to November 1st || ||<#CCFFCC> {*} ''' Ubuntu Developer Summit''' ||   ||
Line 15: Line 17:
||<style="color:#FF0000;"> '''U+1''' || date TBC || ||<#CCFFCC> '''Testing the tool chain''' || ||
|| 3 || May 17th || A-2 ||<#CCFFCC> || ||
|| 4 || May 24th || A-2 ||<#CCFFCC> || ||
|| 5 || May 31st || A-2 ||<#CCFFCC> /!\ FeatureDefinitionFreeze || ||
||<-5 #eeeeee> June 2012 ||
||<style="color:#FF0000;"> '''U+1''' || June 2 - 6 || ISO testing ||<#FFFFCC> '''Live session and install tests of pre-alpha 1 ISO''' || ||
|| 6 || June 7th || A-2 ||<#FFFFCC> || Alpha 1 ||
||<style="color:#FF0000;"> '''U+1''' ||||<(> June 7 - August 09 ||<#FFFFCC> '''Identifying and testing packages subject to Partner Upload Deadline''' || ||
||<style="color:#FF0000;"> '''U+1''' ||||<(> June 7 - August 23 ||<#FFFFCC> '''Identifying and testing packages subject to a Feature Freeze Deadline''' || ||
||<style="color:#FF0000;"> '''U+1''' ||||<(> June 7 - August 30 ||<#FFFFCC> '''Identifying and testing packages subject to User Interface Freeze''' || ||
|| 7 || June 14th || A-2 ||<#FFFFCC> || ||
|| 8 || June 21th || A-2 ||<#FFFFCC> /!\ DebianImportFreeze || ||
||<style="color:#FF0000;"> '''U+1''' ||||<(> June 21 onwards ||<#FFFFCC> '''Identifying and testing Debian packages post Debian Import Freeze''' || ||
||<style="color:#FF0000;"> '''U+1''' || June 23 - 27 || ISO testing ||<#FFFFCC> '''Live session and install tests of pre-alpha 2 ISO''' || ||
|| 9 || June 28th || A-2 ||<#FFFFCC> || Alpha 2 ||
||<-5 #eeeeee> July 2012 ||
|| 10 || July 5th || Iteration Planning ||<#FFEBBB> || ||
|| 11 || July 12th || A-3 ||<#FFEBBB> || Rally ||
|| 12 || July 19st || A-3 ||<#FFEBBB> || ||
|| 13 || July 26th || A-3 ||<#FFEBBB> || ||
||<style="color:#FF0000;"> '''U+1''' || July 28 - Aug 01 || ISO testing ||<#FFEBBB> '''Live session and install tests of pre-alpha 3 ISO''' || ||
||<-5 #eeeeee> August 2012 ||
|| 14 || August 2nd || A-3 ||<#FFEBBB> || Alpha 3 ||
|| 15 || August 9th || Iteration Planning ||<#FFCCCC> || ||
|| 16 || August 16th || Beta UI ||<#FFCCCC> || {*} '''Ubuntu 12.04.1'''||
|| 17 || August 23rd || Beta UI ||<#FFCCCC> /!\ FeatureFreeze || ||
|| 18 || August 30th || Beta UI ||<#FFCCCC> /!\ UserInterfaceFreeze, /!\ Beta 1 Freeze || ||
||<-5 #eeeeee> September 2012 ||
||<style="color:#FF0000;"> '''U+1''' || September 01 - 05 || ISO testing ||<#FFCCCC> '''Live session and install tests of pre-beta 1 ISO''' || ||
|| 19 || September 6th || Beta UI||<#FFCCCC> || Beta 1 ||
|| 20 || September 13th || Quality ||<#E47A7A> || ||
|| 21 || September 20nd || Quality ||<#E47A7A> /!\ Beta 2 Freeze || ||
||<style="color:#FF0000;"> '''U+1''' || September 22 - 26 || ISO testing ||<#E47A7A> '''Live session and install tests of pre-beta 2 ISO''' || ||
|| 22 || September 27th || Quality ||<#E47A7A> || Beta 2 ||
||<style="color:#FF0000;"> '''U+1''' || October 29th to November 4th || Other Project ||<#CCFFCC> '''LibreOffice 3.6.3 Released''' ||
||<-5 #eeeeee> November 2012 ||
|| 2 || November 1st || ||<#CCFFCC> || ||
|| 3 || November 8th || ||<#FFFFCC> || ||
||<style="color:#FF0000;"> '''U+1''' || November 14th || Other Project ||<#FFFFCC> '''Gnome 3.6.2 Released''' ||
|| 4 || November 15th || ||<#FFFFCC> || ||
||<style="color:#FF0000;"> '''U+1''' || November 20th || Other Project ||<#FFFFCC> '''FireFox 17 & Beta 18 Released''' ||
||<style="color:#FF0000;"> '''U+1''' || November 20th || Other Project ||<#FFFFCC> '''Gnome 3.7.91 Beta Released''' ||
|| 5 || November 22nd || ||<#FFFFCC> /!\ FeatureDefinitionFreeze || ||
|| 6 || November 29th || ||<#FFFFCC> || ||
||<-5 #eeeeee> December 2012 ||
|| 7 || December 6th || ||<#FFEBBB> Alpha 1 (tentative, flavours only) || ||
|| 8 || December 13th || ||<#FFEBBB> || ||
|| 9 || December 20th || ||<#FFEBBB> || ||
|| 10 || December 27th || ||<#FFEBBB> /!\ 12.04.2 kernel source freeze || ||
||<-5 #eeeeee> January 2013 ||
|| 11 || January 3rd || ||<#FFEBBB> || ||
||<style="color:#FF0000;"> '''U+1''' || Week of January 6th || Other Project ||<#FFEBBB> '''FireFox 18 & Beta 19 Released''' ||
|| 12 || January 10th || ||<#FFEBBB> 12.04.2 kernel freeze || ||
|| 13 || January 17th || ||<#FFEBBB> || ||
||<style="color:#FF0000;"> '''U+1''' || Week of January 23rd || Other Project ||<#FFEBBB> '''KDE SC 4.10 Released''' ||
|| 14 || January 24th || ||<#FFEBBB> || ||
|| 15 || January 31st || ||<#FFEBBB> 12.04.2 || ||
||<-5 #eeeeee> February 2013 ||
|| 16 || February 7th || ||<#FFCCCC> Alpa 2 (tentative, flavours only) || ||
|| 17 || February 14th || ||<#FFCCCC> Debian Import Freeze || ||
||<style="color:#FF0000;"> '''U+1''' || Week of February 18th || Other Project ||<#FFCCCC> '''FireFox 19 & Beta 20 Released''' ||
|| 18 || February 21st || ||<#FFCCCC> || ||
|| 19 || February 28th || ||<#FFCCCC> || ||
||<-5 #eeeeee> March 2013 ||
||<style="color:#FF0000;"> '''U+1''' || March 5th || Other Project ||<#FFCCCC> '''KDE SC 4.10.1 Released''' ||
|| 20 || March 7th || ||<#E47A7A> /!\ Feature Freeze || ||
||<style="color:#FF0000;"> '''U+1''' || Week of March 10th || Other Project ||<#E47A7A> '''Xfce 4.12 Released''' ||
|| 21 || March 14th || ||<#E47A7A> /!\ Beta 1 (tentative, flavours only) || ||
||<style="color:#FF0000;"> '''U+1''' || March 20th || Other Project ||<#E47A7A> '''Gnome 3.7.92 Released''' ||
|| 22 || March 21st || ||<#E47A7A> /!\ FinalBetaFreeze /!\UserInterfaceFreeze || ||
Line 50: Line 54:
|| 23 || October 4th || Quality ||<#E47A7A> /!\ KernelFreeze, /!\ DocumentationStringFreeze, /!\ NonLanguagePackTranslationDeadline || ||
||<style="color:#FF0000;"> '''U+1''' || Date TBC || ||<#E47A7A> '''Identifying and testing kernel packages post kernel freeze''' || ||
|| 24|| October 11th || Quality ||<#BB3333> /!\ FinalFreeze, /!\ ReleaseCandidate, /!\ LanguagePackTranslationDeadline || ||
||<style="color:#FF0000;"> '''U+1''' || October 13 - 17 || ISO testing ||<#BB3333> '''Live session and install tests of pre-final release''' || ||
||<style="color:#FF0000;"> '''U+1''' || Date TBC || ||<#BB3333> '''Identifying and testing packages relative to post release candidate''' || ||
|| 25|| October 18th || Quality ||<#BB3333> /!\ '''FinalRelease''' || {*} '''Ubuntu 12.10''' ||
|| 23 || March 28th || ||<#E47A7A> /!\ FinalBetaRelease || ||
||<-5 #eeeeee> April 2013 ||
||<style="color:#FF0000;"> '''U+1''' || April 1st || Other Project ||<#E47A7A> '''FireFox 20 & Beta 21 Released''' ||
||<style="color:#FF0000;"> '''U+1''' || April 2nd || Other Project ||<#E47A7A> '''KDE SC 4.10.2 Released''' ||
|| 24|| April 4th || ||<#E47A7A> /!\ DocumentationStringFreeze || ||
|| 25|| April 11th || ||<#E47A7A> /!\ KernelFreeze, /!\ NonLanguagePackTranslationDeadline || ||
|| 26|| April 18th || ||<#BB3333> /!\ FinalFreeze, /!\ Release Candidate. /!\ LanguagePackTranslationDeadline || ||
|| 27|| April 25th || ||<#BB3333> /!\ '''FinalRelease''' {*} '''Ubuntu 13.04''' || ||
Line 57: Line 64:

/* each cell has a place holder with the same colour as the background. This hides the text. Replace the place holder with your text and remove the style=color format and change the background color or remove it */
/* Unused cells have have #F1F1DD as the background color; Test dates yet to be held should have red background. Test dates completed should have green background. */

||Alpha 1||June 02-06||
||Alpha 2||||<style="background-color:#F1F1DD;"> ||June 23 - 27 ||
||Alpha 3||||<style="background-color:#F1F1DD;"> ||||<style="background-color:#F1F1DD;"> ||||July 28 - August 01||
||Beta 1 ||||<style="background-color:#F1F1DD;"> ||||<style="background-color:#F1F1DD;"> ||||<style="background-color:#F1F1DD;"> ||||September 01 - 05||
||Beta 2 ||||<style="background-color:#F1F1DD;"> ||||<style="background-color:#F1F1DD;"> ||||<style="background-color:#F1F1DD;"> ||||<style="background-color:#F1F1DD;"> ||||September 22 - 26||
||12.10 ||||<style="background-color:#F1F1DD;"> ||||<style="background-color:#F1F1DD;"> ||||<style="background-color:#F1F1DD;"> ||||<style="background-color:#F1F1DD;"> ||||<style="background-color:#F1F1DD;"> ||||October 13 - 17||

||New task||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||
||New task||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||
||New task||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||

= Coordinated =

/* Each cell has a place holder with the same colour as the background. This hides the text. Replace the place holder with your text and remove the style=color format for the text and change the background color or remove it */
/* Unused cells have have #F1F1DD as the background color; Test dates yet to be held should have red background. Test dates completed should have green background. */

||New task||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||
||New task||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||
||New task||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||
||New task||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Start date||

= Regular =

/* each cell has a place holder with the same colour as the background. This hides the text. Replace the place holder with your text and remove the style=color format and change the background color or remove it */
/* Unused cells have have #F1F1DD as the background color; Test dates yet to be held should have red background. Test dates completed should have green background. */

||New task||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||
||New task||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||
||New task||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||<style="background-color:#F1F1DD;" style="color:#F1F1DD;">Period||

||Daily ISO testing||<style="background-color:#FFFF80;" width="75%"> || 18 October ||

Color ranges being tested here. I want paler colors than these.

||<style="background-color:#FFFF00;">placeholder||<style="background-color:#00FF00;">Placeholder||<style="background-color:#FF0000;">Placeholder||<style="background-color:#0000FF;">Placeholder||<style="background-color:#00FFFF;">Placeholder||<style="background-color:#FF00FF;">Placeholder||Placeholder||Placeholder||
||placeholder||Placeholder||Placeholder||Placeholder||Placeholder||Placeholder||Placeholder||Placeholder||

= Ideas =

Team Structure
align="middle"

Home
History of U+1
Team FAQ
Contact U+1
Join U+1

Team WorkIconsPage/picto_engineering_48.png

Blog
Staff
Roles
Activities
Agenda

Docs & ToolsIconsPage/picto_articles_48.png

Testers FAQ
Testers Wiki
Tools
Library
Ubuntu Forums

Ideas & ProjectsIconsPage/picto_education_48.png

Brainstorming
ToDo
Ongoing
Instructional Development

The U+1 Team is looking for new members. Only basic skills are needed for most tasks. This is an opportunity to join a friendly and talented community, learn fast and be an active part in Ubuntu future. Click here to know more.

Activities Planner and Development Release Schedule

  • Period: RR (13.04) Development Cycle (October 2012 to April 2013).

  • Start date: Release date of Quantal Quetzal (18th October 2012).

  • Weeks: Start on a Thursday.

  • Aim: To identify testing opportunities that fit in with the development release process.

Week

Date (Thursday)

Work Item Iteration

Status 13.04 Events

Notes

October 2012

1

October 25th

Info <!> Toolchain Uploaded

October 29th to November 1st

Ubuntu Ubuntu Developer Summit

U+1

How to get the Development Release

Tester's wiki

U+1

October 29th to November 4th

Other Project

LibreOffice 3.6.3 Released

November 2012

2

November 1st

3

November 8th

U+1

November 14th

Other Project

Gnome 3.6.2 Released

4

November 15th

U+1

November 20th

Other Project

FireFox 17 & Beta 18 Released

U+1

November 20th

Other Project

Gnome 3.7.91 Beta Released

5

November 22nd

Warning /!\ FeatureDefinitionFreeze

6

November 29th

December 2012

7

December 6th

Alpha 1 (tentative, flavours only)

8

December 13th

9

December 20th

10

December 27th

Warning /!\ 12.04.2 kernel source freeze

January 2013

11

January 3rd

U+1

Week of January 6th

Other Project

FireFox 18 & Beta 19 Released

12

January 10th

12.04.2 kernel freeze

13

January 17th

U+1

Week of January 23rd

Other Project

KDE SC 4.10 Released

14

January 24th

15

January 31st

12.04.2

February 2013

16

February 7th

Alpa 2 (tentative, flavours only)

17

February 14th

Debian Import Freeze

U+1

Week of February 18th

Other Project

FireFox 19 & Beta 20 Released

18

February 21st

19

February 28th

March 2013

U+1

March 5th

Other Project

KDE SC 4.10.1 Released

20

March 7th

Warning /!\ Feature Freeze

U+1

Week of March 10th

Other Project

Xfce 4.12 Released

21

March 14th

Warning /!\ Beta 1 (tentative, flavours only)

U+1

March 20th

Other Project

Gnome 3.7.92 Released

22

March 21st

Warning /!\ FinalBetaFreeze /!\UserInterfaceFreeze

October 2012

23

March 28th

Warning /!\ FinalBetaRelease

April 2013

U+1

April 1st

Other Project

FireFox 20 & Beta 21 Released

U+1

April 2nd

Other Project

KDE SC 4.10.2 Released

24

April 4th

Warning /!\ DocumentationStringFreeze

25

April 11th

Warning /!\ KernelFreeze, Warning /!\ NonLanguagePackTranslationDeadline

26

April 18th

Warning /!\ FinalFreeze, Warning /!\ Release Candidate. Warning /!\ LanguagePackTranslationDeadline

27

April 25th

Warning /!\ FinalRelease Ubuntu Ubuntu 13.04


U+1/activities (last edited 2016-06-08 11:01:09 by localhost)