ToPackage
The "Must Complete By:" sections need real dates that space out the work. -C.Kontros
PLEASE DO NOT EDIT THIS PAGE UNLESS YOUR ON THE UBUNTU STUDIO TEAM.
Soma Suite
About: http://www.somasuite.org
Package Name |
Assingment |
Status |
Must Complete By: |
Notes |
Soma |
luisbg |
Not Started |
2/1/07 |
none |
SomaX |
Not started |
... |
Waiting on libsoma |
|
none |
Done |
2/1/07 |
Synced From Debian |
|
luisbg |
Not Started |
2/1/07 |
none |
|
luisbg |
Not Started |
2/1/07 |
none |
|
Almost done. |
2/1/07 |
build issues need fixing, packaging otherwise finished |
||
Not Started |
2/1/07 |
none |
||
Not Started |
2/1/07 |
none |
||
luisbg |
Not Started |
2/1/07 |
none |
|
Not Started |
2/1/07 |
none |
||
SomaMdD |
rexbron |
In Progress |
2/1/07 |
none |
Cinelerra-CV
About: http://cvs.cinelerra.org/
Package Name |
Assingment |
Status |
Must Complete By: |
Notes |
Cinelerra-CV |
muzzol |
In Progress |
2/1/07 |
none |
Jahshaka
About: http://www.jahshaka.org/
Package Name |
Assingment |
Status |
Must Complete By: |
Notes |
jahshaka |
rexbron |
Not Started |
2/1/07 |
Deffering until next upstream release.[1] |
Notes
[1] - Was unable to compile any version. Many unlisted dependencies with build issues. Reviewed the responce from the forums, same thing. The project is being rewritten from scratch for next upstream release, will reconsider for inclusion then. http://www.jahshaka.org/forum/showthread.php?t=1140&page=3&highlight=ubuntu (AndrewHunter)
Wired
About: http://wired.epitech.net/
Package Name |
Assingment |
Status |
Must Complete By: |
Notes |
wired |
none |
unknown |
2/1/07 |
Should be synced From Debian |
Murrine
About: http://cimi.netsons.org/pages/murrine.php
Package Name |
Assingment |
Status |
Must Complete By: |
Notes |
murrine |
rexbron |
Uploaded to REVU. Approved |
2/1/07 |
Used murrine-0.13 and updated to 0.31. Testing binary available [http://www.aehunter.net/Files/gtk2-engines-murrine_0.40.1-0ubuntu1_i386.deb here]See Notes. |
Notes
- The package has been approved, but is being delayed from upload until new upstream is released (around 2nd week of January 2007).
- Im having different results on Feisty than Edgy with the package from the murrine repo. I have to look into this. -C.Kontros
Packaging Timeline
The absolute last date to get packages in Universe is 2/7/07.