2011-01-03-SR
10135
Comment:
|
← Revision 134 as of 2011-01-03 17:52:04 ⇥
10391
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
* none (first meeting after all ;) ) | * 2010-11-22 * [cjwatson, apw, Keybuk, azul] - to come up with proposal to handle upstart interaction/bug 642555 - ??? * [victorp] look at adding hardware cert reports with architectures as one of the pieces of info tracked for SRU meeting - DONE * [pedro, marjo] - look at adding regression test report as one of the pieces of info tracked for SRU meeting. - DONE * 2010-12-03 * [pitti, kees, sconklin] - get together and propose adjustments process if needed, then broadcast new dates. - DONE * [skaet] call meeting to discussing outcome of sconklin's meeting with pitti and kees. - DONE |
Line 17: | Line 23: |
* Release-targeted bugs (snapshot 2010/11/17) | * Release-targeted bugs (snapshot 2011/01/03 (2010/12/06) ) |
Line 20: | Line 26: |
|| Maverick || [[https://bugs.launchpad.net/ubuntu/maverick/+bugs| 333 ]] || [[ http://goo.gl/l7FIy | 2 ]] || 55 || 66 || || Lucid || [[https://bugs.launchpad.net/ubuntu/lucid/+bugs|623 ]] || [[ http://goo.gl/N5cPc | 5 ]] || 113 || 161 || || Karmic || [[https://bugs.launchpad.net/ubuntu/karmic/+bugs|283]] || 3 || 39 || 115 || || Hardy || [[https://bugs.launchpad.net/ubuntu/hardy/+bugs|458]] || 0 || 65 || 180 || || Dapper || [[https://bugs.launchpad.net/ubuntu/dapper/+bugs|211]] || 1 || 14 || 67 || |
|| Maverick || [[https://bugs.launchpad.net/ubuntu/maverick/+bugs| 377 (+37) ]] || [[ http://goo.gl/l7FIy | 5 (+3) ]] || 63 (+4) || 80 (+8) || || Lucid || [[https://bugs.launchpad.net/ubuntu/lucid/+bugs|666 (+24) ]] || [[http://goo.gl/N5cPc | 4 (-1) ]] || 122 (+6) || 175 (+6)|| || Karmic || [[https://bugs.launchpad.net/ubuntu/karmic/+bugs|284 (-2)]] || [[http://goo.gl/7Ek7t | 3 (0) ]] || 37 (-1) || 114 (-1) || || Hardy || [[https://bugs.launchpad.net/ubuntu/hardy/+bugs|455 (-4)]] || [[http://goo.gl/UYE2K| 0 (0) ]] || 62 (-3) || 179 (-4) || || Dapper || [[https://bugs.launchpad.net/ubuntu/dapper/+bugs|209 (-3)]] || [[http://goo.gl/xHuIU| 1 (0) ]] || 14 (0) || 67 (-1) || |
Line 63: | Line 69: |
* Bug:635344:After my CD-Rom is ejected, the tray will instantly retract. ''[sconklin] - need to determine if can come up with fix for RC and where fix needs to happen'' | * Bug:635344:After my CD-Rom is ejected, the tray will instantly retract. ''[sconklin] - need to determine if can come up with fix for RC and where fix needs to happen 2010-11-26, update?'' |
Line 68: | Line 74: |
* Bug:563916:[details.so] No prompt for [S]kip or [M]anual recovery on server boot - ''[cjwatson] - release candiate, on list'' | * Bug:579850: mount segfault on shutdown when unmounting autofs mountpoint - ''?'' |
Line 73: | Line 79: |
* Resolved * Bug:563916:[details.so] No prompt for [S]kip or [M]anual recovery on server boot - ''FIX COMMITTED'' |
|
Line 76: | Line 85: |
* Bug:671103:backport grub-legacy-ec2 from maverick to lucid - ''[cjwatson] - accepted for validation already - will go out as SRU '' | * None * Resolved * None |
Line 81: | Line 92: |
* Bug:525807:[upstream] [3.2.1] OOo Slide Show and Fullscreen modes - not full screen under compiz - ''[pitti] - pending finding an OOo maintainer'' * Bug:625280:SRU: xserver-xorg-video-geode 2.11.9-1 to Lucid and older supported releases - ''[pitti] - will investigate '' |
* Bug:525807:[upstream] [3.2.1] OOo Slide Show and Fullscreen modes - not full screen under compiz - ''[pitti] - pending finding an OOo maintainer; pretty much "can't fix" until then'' * Bug:625280:SRU: xserver-xorg-video-geode 2.11.9-1 to Lucid and older supported releases - ''[pitti] - just needs an upload and test, pinged Martin-Eric on the bug'' |
Line 87: | Line 98: |
* ''[ScottK via IRC on ubuntu-devel 11/22] - Tech board has approved putting KDE point releases into -updates. Kubuntu will update to KDE 4.4.5 (and 4.4.7 for kdepim) for 10.04.2'' | * Kubuntu will update to KDE 4.4.5 (and 4.4.7 for kdepim) for 10.04.2 - ''[ScottK] KDE 4.4.5 is pending in lucid-proposed, has been marked verification done, so should make it into 1/27 drop with no issues'' |
Line 91: | Line 102: |
* Recent * Lucid shipped on 12/20 ( tracked: http://launchpad.net/bugs/683425 ) * Maverick shipped on 12/20 ( tracked: http://launchpad.net/bugs/683422 ) * Next * -ec2 pending testing * Karmic - validation in progress, in general, karmic and earlier don't follow 2 week cadence and will rely on traditional community testing/burn in cycle unless resources available from testing teams. * 1/6 - will be skipped, nothing in queue over holidays - probably should take this into account on future scheduling. * Lucid - 1/27 * Maverick - 1/27 * Security - ?? not aware of any hot issues to force earlier at this point. |
|
Line 98: | Line 121: |
Notes: * ''[cjwatson] sponsored 671097 and milestoned this for server team'' * ''[cjwatwon] bug 554172, don't know a good fix. Need discussion on solutions, see action items'' * ''[victorp] certification testing for lucid done on ubuntu for netbooks, desktop edition (laptops and pc) sevrers, i386 and amd64) testing link: http://people.canonical.com/~cr3/hw-testing/lucid-proposed.html'' * ''[skaet] decision to ship lucid SRU update without regression testing formalized, some concern on it not baking for a week - reverts not reseting -proposed is the concern'' * ''[skaet] shipping maverick SRU will be decided after we get result of SRU testing - action taken to call meeting to discuss tomorrow'' |
|
Line 109: | Line 125: |
* what is the status of the regression automation infrastructure? * Current SRU status: * http://reports.qa.ubuntu.com/reports/sru/latest.html * Questions: |
* [[http://reports.qa.ubuntu.com/reports/sru/latest.html|Current SRU status]] * Questions: * what is the status of the regression automation infrastructure? |
Line 116: | Line 130: |
* is there a report that details the regression run report for the current SRU kernel update? ''[pedro] will take an action to provide next time '' | * is there a report that details the regression run report for the current SRU kernel update? ''[pedro] took an action to provide this time '' |
Line 123: | Line 137: |
* what is the status of the hardware certification infrastructure automation? | * SRU Testing for Lucid and Maverick * [[http://people.canonical.com/~hwcert/sru-testing/current|Latest Test Results]] * [[http://people.canonical.com/~hwcert/sru-testing/|Test Results Archive]] |
Line 126: | Line 142: |
* is there a report that illustrates the results of the last cerification run? ( is http://people.canonical.com/~fader/hw-testing/current.html still in use ) - ''[victorp] see http://people.canonical.com/~cr3/hw-testing/lucid-proposed.html, was request to add architectures, and extend to releases '' * Questions: * how much time should be allocated for automated certification run, in planning? (assuming no significant regression) |
* overview of schedule and window? Ara's calendar * Questions: * any adjustment to 2-day time allocated for automated certification run, in planning? (assuming no significant regression) |
Line 156: | Line 172: |
* Questions: * Should this link be updated? : https://wiki.ubuntu.com/ServerTeam/StableReleaseTracker -- ''[[zul] - this is obsolete'' * Is this the official one? : http://people.canonical.com/~chucks/SRUTracker/sru-tracker-bugs.html -- ''[zul] - this is the one to use'' |
* [[http://people.canonical.com/~chucks/SRUTracker/sru-tracker-bugs.html|Server tracked bugs]] * Questions: |
Line 203: | Line 218: |
* http://www.novarata.net/mootbot/ubuntu-meeting.log.20101122_1002.html * http://www.novarata.net/mootbot/ubuntu-meeting.20101122_1002.html |
* http://www.novarata.net/mootbot/ubuntu-meeting.log.20110103_1000.html * http://www.novarata.net/mootbot/ubuntu-meeting.20110103_1000.html |
Line 207: | Line 222: |
* [cjwatson, apw, Keybuk, azul] - to come up with proposal to handle upstart interaction/bug 642555 * [victorp] look at adding hardware cert reports with architectures as one of the pieces of info tracked for SRU meeting * [pedro, marjo] - look at adding regression test report as one of the pieces of info tracked for SRU meeting. * [victorp, pedro, bjf, skaet] to set date for next target SRU release. We'll be skipping Dec. 2. * [skaet, victorp, bjf, pitti] - meet to discuss SRU release of maverick post hardware cert testing results |
* marjo, bdmurray: triage lucid and maverick new bug surge over holidays - with focus on 10.04.2 coming up. * skaet: broadcast freeze date for 10.04.2 * skaet: update natty interlock wiki with revised SRU biweekly milestones (testing week, verification week, drop, release to be clarified) |
Stable Release Team Agenda
PURPOSE: collaborate on stable release updates and long term support point releases
FREQUENCY: bi-weekly meeting
ACTIVE RELEASES: Maverick, Lucid, Karmic, Hardy, Dapper
RELEASE LIFECYCLE STATUS: https://wiki.ubuntu.com/Releases
Actions from Last Meeting
- 2010-11-22
- [cjwatson, apw, Keybuk, azul] - to come up with proposal to handle upstart interaction/bug 642555 - ???
- [victorp] look at adding hardware cert reports with architectures as one of the pieces of info tracked for SRU meeting - DONE
- [pedro, marjo] - look at adding regression test report as one of the pieces of info tracked for SRU meeting. - DONE
- 2010-12-03
- [pitti, kees, sconklin] - get together and propose adjustments process if needed, then broadcast new dates. - DONE
- [skaet] call meeting to discussing outcome of sconklin's meeting with pitti and kees. - DONE
Features and Bugs Summary
- Release-targeted bugs (snapshot 2011/01/03 (2010/12/06) )
Release |
Bugs Open |
Critical |
High |
New |
Maverick |
63 (+4) |
80 (+8) |
||
Lucid |
122 (+6) |
175 (+6) |
||
Karmic |
37 (-1) |
114 (-1) |
||
Hardy |
62 (-3) |
179 (-4) |
||
Dapper |
14 (0) |
67 (-1) |
- Update targetted bugs
maverick-update : https://bugs.launchpad.net/ubuntu/+bugs?&field.milestone:list=27564
lucid-update : https://bugs.launchpad.net/ubuntu/+bugs?&field.milestone:list=21448
karmic-update : https://bugs.launchpad.net/ubuntu/+bugs?&field.milestone:list=12716
hardy-update : https://bugs.launchpad.net/ubuntu/+bugs?&field.milestone:list=34695
- note: hardy-updates didn't exist until 11/17 so not accurate at this point - needs a scrub.
dapper-update : https://bugs.launchpad.net/ubuntu/+bugs?&field.milestone:list=135
- Known regressions
https://bugs.launchpad.net/ubuntu/maverick/+bugs?field.tag=regression-potential
https://bugs.launchpad.net/ubuntu/lucid/+bugs?field.tag=regression-potential
https://bugs.launchpad.net/ubuntu/karmic/+bugs?field.tag=regression-potential
https://bugs.launchpad.net/ubuntu/hardy/+bugs?field.tag=regression-potential
https://bugs.launchpad.net/ubuntu/dapper/+bugs?field.tag=regression-potential
- Nominated bugs
10.04.2 Long Term Support Status
Planned Release Date: February 17, 2011
- Related Blueprints
- None
- Milestoned Bug Summary
Kernel
- Unresolved Important Bugs
635344:After my CD-Rom is ejected, the tray will instantly retract. [sconklin] - need to determine if can come up with fix for RC and where fix needs to happen 2010-11-26, update?
Foundations
- Unresolved Important Bugs
579850: mount segfault on shutdown when unmounting autofs mountpoint - ?
591207:Casper's USB update-initramfs shim should look for initrd.img in /boot - [cjwatson] - .1 attempt failed, will see if possible, ev to look at
607657:Lucid point release installer must support LTS backported Kernels - [cjwatson] - release candiate, on list
635273:Building debs with SWIG libraries do not work - [cjwatson] - under investigation.
- Resolved
563916:[details.so] No prompt for [S]kip or [M]anual recovery on server boot - FIX COMMITTED
Server
- Unresolved Important Bugs
- None
- Resolved
- None
Desktop
- Unresolved Important Bugs
525807:[upstream] [3.2.1] OOo Slide Show and Fullscreen modes - not full screen under compiz - [pitti] - pending finding an OOo maintainer; pretty much "can't fix" until then
625280:SRU: xserver-xorg-video-geode 2.11.9-1 to Lucid and older supported releases - [pitti] - just needs an upload and test, pinged Martin-Eric on the bug
459647:Cannot change mouse cursor theme when compiz is enabled - [pitti] compiz has been going off/on - jeopardizes stability, so may declare permanently broken in lucid.
Kubuntu
Kubuntu will update to KDE 4.4.5 (and 4.4.7 for kdepim) for 10.04.2 - [ScottK] KDE 4.4.5 is pending in lucid-proposed, has been marked verification done, so should make it into 1/27 drop with no issues
Stable Release Updates
- Recent
Lucid shipped on 12/20 ( tracked: http://launchpad.net/bugs/683425 )
Maverick shipped on 12/20 ( tracked: http://launchpad.net/bugs/683422 )
- Next
- -ec2 pending testing
- Karmic - validation in progress, in general, karmic and earlier don't follow 2 week cadence and will rely on traditional community testing/burn in cycle unless resources available from testing teams.
- 1/6 - will be skipped, nothing in queue over holidays - probably should take this into account on future scheduling.
- Lucid - 1/27
- Maverick - 1/27
- Security - ?? not aware of any hot issues to force earlier at this point.
Existing Process Documentation: https://wiki.ubuntu.com/StableReleaseUpdates
Existing Kernel SRU Process: https://wiki.ubuntu.com/KernelTeam/KernelUpdates
New Kernel SRU Process being piloted: https://wiki.ubuntu.com/Kernel/StableReleaseCadence
Overall SRU Status: http://people.ubuntu.com/~ubuntu-archive/pending-sru.html
Quality Assurance
- Questions:
- what is the status of the regression automation infrastructure?
This report still looks like its being run, can it be updated to reflect the current releases? see: http://people.ubuntu.com/~sbeattie/sru_todo.html
is there a report that details the regression run report for the current SRU kernel update? [pedro] took an action to provide this time
- what has changed in terms of the bug validation over the last week for the current SRU proposed packages?
- how many packages moved from proposed to updates/security in last week?
Hardware Certification
- SRU Testing for Lucid and Maverick
- Current SRU status:
- overview of schedule and window? Ara's calendar
- Questions:
- any adjustment to 2-day time allocated for automated certification run, in planning? (assuming no significant regression)
Kernel
- Questions:
- Which bugs that are being targetted for next SRU testing cycle?
- Which kernels will need SRU testing?
- What date will the kernel(s) be available for build? test?
- Any security issues that may impact next cycle?
- What is the priority list of SRU candidate bugs that will be worked on in next two weeks?
Security
- Questions:
- Any show stoppers likely which will cause kernel SRU release cycle to be skipped?
- Any packages which need to have SRU bugs validated?
- Any SRU candidate bugs against packages to be worked on in next two weeks?
Foundations
- Questions:
- Any packages which need to have SRU bugs validated?
- Any SRU candidate bugs against packages to be worked on in next two weeks?
Server
- Questions:
- Any packages which need to have SRU bugs validated?
- Any SRU candidate bugs against packages to be worked on in next two weeks?
ARM
- Questions:
- Any packages which need to have SRU bugs validated?
- Any SRU candidate bugs against packages to be worked on in next two weeks?
Desktop
- Questions:
- Any packages which need to have SRU bugs validated?
- Any SRU candidate bugs against packages to be worked on in next two weeks?
Ubuntu One
- Questions:
- Any packages which need to have SRU bugs validated?
- Any SRU candidate bugs against packages to be worked on in next two weeks?
Kubuntu
- Questions:
- Any packages which need to have SRU bugs validated?
- Any SRU candidate bugs against packages to be worked on in next two weeks?
Derivatives
Linaro
- Questions:
- Any fixes that need to be released in maverick SRU?
- Any SRU candidate bugs against packages to be worked on in next two weeks?
OEM
- Question:
- Any escalation bugs that need to be worked on in next two weeks that should be SRU?
IRC Meeting Log
- mootbot logs available at
ACTIONS
- marjo, bdmurray: triage lucid and maverick new bug surge over holidays - with focus on 10.04.2 coming up.
- skaet: broadcast freeze date for 10.04.2
- skaet: update natty interlock wiki with revised SRU biweekly milestones (testing week, verification week, drop, release to be clarified)
ReleaseTeam/Meeting/2011-01-03-SR (last edited 2011-01-03 17:52:04 by 99-191-111-134)