NewbieGuide

Differences between revisions 6 and 7
Revision 6 as of 2014-07-03 12:33:35
Size: 3667
Editor: mvo
Comment:
Revision 7 as of 2014-07-03 12:46:45
Size: 3935
Editor: mvo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
So you want to ride the CI train? Great, here is what you need to know: What you need to know if you are new to the citrain landing team:
Line 9: Line 9:
 * wait for new rows in the spreedsheet and perform the "steps for a landing" described below
 * the expectation is to do around 50% of your time on landings
 * wait for new rows in the spreedsheet (the CI-SNCF bot will notify you) and perform the "steps for a landing" described below
 * the expectation is to do up to 50% of your work time on landings
Line 13: Line 13:

The citrain is a tool to coordinate landing of new features. This includes building/testing and publishing.
Line 14: Line 17:
 * First column in the spreedsheet is important! Keep attention to the number of free silos, try to keep slios free
 * The spreedsheet has multiple page, the main one is "pending", but there is a important one "Archive" that contains *all* of the history
 * Merge propoosal to land (row F) is important, order is important too but its not limited to a single project
 * First column in the spreedsheet is important! Keep attention to the number of free silos, try to keep 1 slio free for emergency landings
 * The spreedsheet has multiple page (sheets), the main one is "pending", but there is also "Archive" that contains *all* of the history and pages for each landing slio.
 * Merge propoosal to land (row F) is important, order of the branches is important. Branches are not limited to a single project
Line 19: Line 22:
 * Ready? : really important, once its ready, assign to a silo  * Ready? : really important, once its ready, assign to a silo via "landing team tools/assign silo" menu item (more see below)
Line 21: Line 24:
== What about CI-Airline ==
 * replaces all of CI-Train
   * no spreedsheet
   * no jenkins
   * see http://blueprints.launchpad.net/ubuntu/+spec/core-1311-ci-airline
   * designed by didrocks, worked on by citeam
 * will be ready ~July 2014

== Important Terms ==
 * Silo are PPAs that are used to prepare a landing
 * Landers are trusted people of the upstream project who can drive landing and do the final testing
 * TrainCon-Zero: when no new image is generated for 7 buisiness days this "emergency" state is reached and only critical fixes can go in
 * CI Train Sherrif is the guy/gal currently doing landings
Line 56: Line 46:
== Important links == == What about CI-Airline ==
 * will replace all of CI-Train
   * no spreedsheet
   * no jenkins
   * see http://blueprints.launchpad.net/ubuntu/+spec/core-1311-ci-airline
   * designed by didrocks, worked on by citeam
 * will be ready ~July 2014

== Terms ==
 * Silo are PPAs that are used to prepare a landing
 * Landers are trusted people of the upstream project who can drive landing and do the final testing
 * TrainCon-Zero: when no new image is generated for 7 buisiness days this "emergency" state is reached and only critical fixes can go in
 * CI Train Sherrif is the guy/gal currently doing landings

== Links ==

Newbie guide

What you need to know if you are new to the citrain landing team:

What do do

  • read this document
  • join #ubuntu-ci-eng
  • join #ubuntu-ci-choo-choo and highlight on "trainguards" (the bot "CI-SNCF" has a bunch of commands (like where unity8))
  • wait for new rows in the spreedsheet (the CI-SNCF bot will notify you) and perform the "steps for a landing" described below
  • the expectation is to do up to 50% of your work time on landings

What is it

The citrain is a tool to coordinate landing of new features. This includes building/testing and publishing.

  • Its all in one google spreedsheet https://wiki.ubuntu.com/citrain that mostly updates itself automatically (its a frontend to jenkins)

  • First column in the spreedsheet is important! Keep attention to the number of free silos, try to keep 1 slio free for emergency landings
  • The spreedsheet has multiple page (sheets), the main one is "pending", but there is also "Archive" that contains *all* of the history and pages for each landing slio.
  • Merge propoosal to land (row F) is important, order of the branches is important. Branches are not limited to a single project
  • Additional source packages to land: you need to dput these additional source packages from the archive into the silo PPA
  • QA sign off needed: only in effect if we are in train-con-zero - and then *only* stuff with QA-sign-off: no can enter the image
  • Ready? : really important, once its ready, assign to a silo via "landing team tools/assign silo" menu item (more see below)

What steps for a landing

  • landing for a request:
    • check if it has a testplan
    • check if the package is locked already (via hoover over column F)
    • check that its ready
    • go to the "Landing team tools" menubar and click on "assign silo"
      • this generates a request-id that is valid for 5min
      • opens a dialog that you need to check
      • the jenkins tab opens, click on "proceed"
      • opens a jenkins job page
      • check that the speedsheet updates after some time
      • the details for the landing are in a spreedsheet page N, e.g. "landing-07"
      • its the job of the lander to click on "BUILD" on this spreedsheet page (which will bring you to a PPA)
    • once the thing is ready and the lander has executed the test plan he/she sets the status column to testing-done
    • once that is the case, we go to the landing sheet of the spreedsheet and click on "PUBLISH"
    • this brings you to jenkins
    • if there are changes in debian/* it generates a diff and that needs approval first via the "ACK_PACKAGING" box in the build jenkins subpage and press "build"
    • ???
    • lander will click on "merge & clean"

What about CI-Airline

Terms

  • Silo are PPAs that are used to prepare a landing
  • Landers are trusted people of the upstream project who can drive landing and do the final testing
  • TrainCon-Zero: when no new image is generated for 7 buisiness days this "emergency" state is reached and only critical fixes can go in

  • CI Train Sherrif is the guy/gal currently doing landings

citrain/NewbieGuide (last edited 2015-09-02 04:12:32 by 1)