indicator-power
The source for this document can be gotten from Bazaar:
$ bzr cat lp:indicator-power/MERGE-REVIEW
Checklist for component: indicator-power
Component Test Plan: https://wiki.ubuntu.com/Process/Merges/TestPlan/indicator-power
Trunk URL: lp:indicator-power
Ubuntu Package URL (LP): http://launchpad.net/ubuntu/+source/indicator-power
This documents the expections that the project has on what both submitters and reviewers should ensure that they've done for a merge into the project.
MP Submission Checklist Template
Note: Please ensure you include the following form filled out and submitted along side your code to the MP ticket.
- Are there any related MPs required for this MP to build/function as expected? Please list.
Is your branch in sync with latest trunk? (e.g. bzr pull lp:trunk -> no changes)
- Did the code build without warnings?
- Did the tests run successfully?
- Did you perform an exploratory manual test run of your code change and any related functionality?
- If you changed the packaging (debian), did you subscribe the ubuntu-unity team to this MP?
- Did your component test plan pass? If on a device, what image number?
- Please list which manual tests are germane for the reviewer in this MR.
Did you provide a link to this page https://wiki.ubuntu.com/Process/Merges/Checklists/indicator-power
MP Review Checklist Template
Note: Please ensure you include the following form filled out and submitted along side your code to the MP ticket.
- Have you checked that the submitter has accurately filled out the submitter checklist and has taken no shortcuts?
- Did you run the manual tests listed by the submitter?
- Did you do exploratory testing related to the component you own with the MP changeset included?
- If new features have been added, are the manual tests sufficient to cover them?
MP Landing Checklist Template
- Ensure that the checklists have been properly filled out by submitter and all reviewers
Process/Merges/Checklists/indicator-power (last edited 2014-09-08 18:33:58 by ip68-12-7-251)