2010-12-06-SR

Differences between revisions 114 and 115
Revision 114 as of 2010-11-18 22:31:04
Size: 7891
Editor: 99-191-111-134
Comment:
Revision 115 as of 2010-11-22 21:44:39
Size: 8660
Editor: 99-191-111-134
Comment:
Deletions are marked like this. Additions are marked like this.
Line 63: Line 63:
    * Bug:635344:After my CD-Rom is ejected, the tray will instantly retract.     * Bug:635344:After my CD-Rom is ejected, the tray will instantly retract. ''[sconklin] - need to determine if can come up with fix for RC and where fix needs to happen''
Line 84: Line 84:

=== Kubuntu ===

  * ''[ScottK via IRC on ubuntu-devel 11/22] - Tech board has approved putting KDE point releases into -updates. Kubuntu will update to KDE 4.4.5 (and 4.4.7 for kdepim) for 10.04.2''
Line 191: Line 195:
##= IRC Meeting Log =
## * mootbot logs available at
## * http://www.novarata.net/mootbot/ubuntu-meeting.log.20101001_1002.html
## * http://www.novarata.net/mootbot/ubuntu-meeting.20101001_1002.html
##
##= ACTIONS =
## * no release meeting next week, questions to #ubuntu-release
= IRC Meeting Log =
 * mootbot logs available at
   * http://www.novarata.net/mootbot/ubuntu-meeting.log.20101122_1002.html
   * http://www.novarata.net/mootbot/ubuntu-meeting.20101122_1002.html

= ACTIONS =
 * cjwatson, apw, Keybuk, azul - to come up with proposal to handle upstart interaction/bug 642555
 * victorp, look at adding hardware cert reports with architectures as one of the pieces of info tracked for SRU meeting
 * pedro, marjo - look at adding regression test report as one of the pieces of info tracked for SRU meeting.
 * victorp, pedro, bjf, skaet to set date for next target SRU release. We'll be skipping Dec. 2.
 * skaet, victorp, bjf, pitti - meet to discuss SRU release of maverick post hardware cert testing results.

Stable Release Team Agenda

  • PURPOSE: collaborate on stable release updates and long term support point releases

  • FREQUENCY: bi-weekly meeting

  • ACTIVE RELEASES: Maverick, Lucid, Karmic, Hardy, Dapper

  • RELEASE LIFECYCLE STATUS: https://wiki.ubuntu.com/Releases

Actions from Last Meeting

  • none (first meeting after all Wink ;) )

Features and Bugs Summary

  • Release-targeted bugs (snapshot 2010/11/17)

Release

Bugs Open

Critical

High

New

Maverick

333

2

55

66

Lucid

623

5

113

161

Karmic

283

3

39

115

Hardy

458

0

65

180

Dapper

211

1

14

67

10.04.2 Long Term Support Status

Planned Release Date: February 17, 2011

Kernel

  • Unresolved Important Bugs
    • 635344:After my CD-Rom is ejected, the tray will instantly retract. [sconklin] - need to determine if can come up with fix for RC and where fix needs to happen

Foundations

  • Unresolved Important Bugs
    • 563916:[details.so] No prompt for [S]kip or [M]anual recovery on server boot

    • 591207:Casper's USB update-initramfs shim should look for initrd.img in /boot

    • 607657:Lucid point release installer must support LTS backported Kernels

    • 635273:Building debs with SWIG libraries do not work

Server

  • Unresolved Important Bugs
    • 671103:backport grub-legacy-ec2 from maverick to lucid

Desktop

  • Unresolved Important Bugs
    • 525807:[upstream] [3.2.1] OOo Slide Show and Fullscreen modes - not full screen under compiz

    • 625280:SRU: xserver-xorg-video-geode 2.11.9-1 to Lucid and older supported releases

    • 459647:Cannot change mouse cursor theme when compiz is enabled

Kubuntu

  • [ScottK via IRC on ubuntu-devel 11/22] - Tech board has approved putting KDE point releases into -updates. Kubuntu will update to KDE 4.4.5 (and 4.4.7 for kdepim) for 10.04.2

Stable Release Updates

Quality Assurance

  • what is the status of the regression automation infrastructure?
  • Current SRU status:
  • Questions:
    • This report still looks like its being run, can it be updated to reflect the current releases? see: http://people.ubuntu.com/~sbeattie/sru_todo.html

    • is there a report that details the regression run report for the current SRU kernel update?
    • what has changed in terms of the bug validation over the last week for the current SRU proposed packages?
    • how many packages moved from proposed to updates/security in last week?

Hardware Certification

  • what is the status of the hardware certification infrastructure automation?
  • Current SRU status:
  • Questions:
    • how much time should be allocated for automated certification run, in planning? (assuming no significant regression)

Kernel

  • Questions:
    • Which bugs that are being targetted for next SRU testing cycle?
    • Which kernels will need SRU testing?
    • What date will the kernel(s) be available for build? test?
    • Any security issues that may impact next cycle?
    • What is the priority list of SRU candidate bugs that will be worked on in next two weeks?

Security

  • Questions:
    • Any show stoppers likely which will cause kernel SRU release cycle to be skipped?
    • Any packages which need to have SRU bugs validated?
    • Any SRU candidate bugs against packages to be worked on in next two weeks?

Foundations

  • Questions:
    • Any packages which need to have SRU bugs validated?
    • Any SRU candidate bugs against packages to be worked on in next two weeks?

Server

ARM

  • Questions:
    • Any packages which need to have SRU bugs validated?
    • Any SRU candidate bugs against packages to be worked on in next two weeks?

Desktop

  • Questions:
    • Any packages which need to have SRU bugs validated?
    • Any SRU candidate bugs against packages to be worked on in next two weeks?

Ubuntu One

  • Questions:
    • Any packages which need to have SRU bugs validated?
    • Any SRU candidate bugs against packages to be worked on in next two weeks?

Kubuntu

  • Questions:
    • Any packages which need to have SRU bugs validated?
    • Any SRU candidate bugs against packages to be worked on in next two weeks?

Derivatives

Linaro

  • Questions:
    • Any fixes that need to be released in maverick SRU?
    • Any SRU candidate bugs against packages to be worked on in next two weeks?

OEM

  • Question:
    • Any escalation bugs that need to be worked on in next two weeks that should be SRU?

IRC Meeting Log

ACTIONS

  • cjwatson, apw, Keybuk, azul - to come up with proposal to handle upstart interaction/bug 642555
  • victorp, look at adding hardware cert reports with architectures as one of the pieces of info tracked for SRU meeting
  • pedro, marjo - look at adding regression test report as one of the pieces of info tracked for SRU meeting.
  • victorp, pedro, bjf, skaet to set date for next target SRU release. We'll be skipping Dec. 2.
  • skaet, victorp, bjf, pitti - meet to discuss SRU release of maverick post hardware cert testing results.

ReleaseTeam/Meeting/2010-12-06-SR (last edited 2010-12-14 22:09:44 by eth3)