Line 1: Line 1:
[[Include(Endorphin_Power_Company_Ubuntu_Install_and_Support/Menu)]] <<Include(Endorphin_Power_Company_Ubuntu_Install_and_Support/Menu)>>
Line 5: Line 5:
The next action date for the EPC project is 3/1/08 Items on the agenda include the following. '''The next action date for the EPC project is 2/7/08 We need the following resources:'''
||'''resources needed'''||'''responsible party'''||
||2 additional 9dbi antennas||?||
||spool cat5||?||
||Double sided sticky Velcro||David Thomas||
||light, power extention cords||jimrz||
||update the 3 routers already at EPC||deinerson1 - '''Done'''||
||find a suitable location in the NW and SE sections of the main building - '''Couch Room and one St. Josephs near a window'''||deinerson1 - '''Done'''||
||determine which 2 rooms will get a router - '''Apartments 14 and 18'''||deinerson1 - '''Done'''||
||measure current [[https://wiki.ubuntu.com/Endorphin_Power_Company_Ubuntu_Install_and_Support/wireless_signal_levels|signal details]] using wavemon in key locations||deinerson1 - '''Done'''||
Line 7: Line 16:
 * More memory to upgrade the computers to at least 512M PC-100
 * 3 More full PC's
 * Set up printer and scan station
 * Test all systems
 * Secure cable runs
'''The next action date for the EPC project is 3/1/09 Items on the agenda include the following.'''

 * Changed the number of repeating routers to 2, as this is what we are going to try first and add more as needed.

 * Also removed some of the items that were from the lab setup.

Items or resources needed

The next action date for the EPC project is 2/7/08 We need the following resources:

resources needed

responsible party

2 additional 9dbi antennas

?

spool cat5

?

Double sided sticky Velcro

David Thomas

light, power extention cords

jimrz

update the 3 routers already at EPC

deinerson1 - Done

find a suitable location in the NW and SE sections of the main building - Couch Room and one St. Josephs near a window

deinerson1 - Done

determine which 2 rooms will get a router - Apartments 14 and 18

deinerson1 - Done

measure current signal details using wavemon in key locations

deinerson1 - Done

The next action date for the EPC project is 3/1/09 Items on the agenda include the following.

  • Changed the number of repeating routers to 2, as this is what we are going to try first and add more as needed.
  • Also removed some of the items that were from the lab setup.

Endorphin_Power_Company_Ubuntu_Install_and_Support/Items (last edited 2009-06-03 03:06:53 by c-68-54-8-56)