The next action date for the EPC project is 3/1/08 Items on the agenda include the following. | '''The next action date for the EPC project is 2/7/08 We need the following resources:''' ||'''resources needed'''||'''responsible party'''|| ||2 additional 9dbi antennas||?|| ||spool cat5||?|| ||Double sided sticky Velcro||David Thomas|| ||light, power extention cords||jimrz|| ||update the 3 routers already at EPC||deinerson1 - '''Done'''|| ||find a suitable location in the NW and SE sections of the main building - '''Couch Room and one St. Josephs near a window'''||deinerson1 - '''Done'''|| ||determine which 2 rooms will get a router - '''Apartments 14 and 18'''||deinerson1 - '''Done'''|| ||measure current [[https://wiki.ubuntu.com/Endorphin_Power_Company_Ubuntu_Install_and_Support/wireless_signal_levels|signal details]] using wavemon in key locations||deinerson1 - '''Done'''|| |
Line 7: | Line 16: |
* More memory to upgrade the computers to at least 512M PC-100 * 3 More full PC's * Set up printer and scan station * Test all systems * Secure cable runs |
'''The next action date for the EPC project is 3/1/09 Items on the agenda include the following.''' * Changed the number of repeating routers to 2, as this is what we are going to try first and add more as needed. * Also removed some of the items that were from the lab setup. |
Items or resources needed
The next action date for the EPC project is 2/7/08 We need the following resources:
resources needed |
responsible party |
2 additional 9dbi antennas |
? |
spool cat5 |
? |
Double sided sticky Velcro |
David Thomas |
light, power extention cords |
jimrz |
update the 3 routers already at EPC |
deinerson1 - Done |
find a suitable location in the NW and SE sections of the main building - Couch Room and one St. Josephs near a window |
deinerson1 - Done |
determine which 2 rooms will get a router - Apartments 14 and 18 |
deinerson1 - Done |
measure current signal details using wavemon in key locations |
deinerson1 - Done |
The next action date for the EPC project is 3/1/09 Items on the agenda include the following.
- Changed the number of repeating routers to 2, as this is what we are going to try first and add more as needed.
- Also removed some of the items that were from the lab setup.