Items
917
Comment:
|
← Revision 23 as of 2009-06-03 03:06:53 ⇥
1232
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
||spool cat5||?|| ||extention cords||jimrz|| |
||2 additional 9dbi antennas||gcleric - '''Done'''|| ||spool cat5||gcleric - '''Done'''|| ||Double sided sticky Velcro||David Thomas|| ||light, power extention cords||jimrz|| ||update the 3 routers already at EPC||deinerson1 - '''Done'''|| ||find a suitable location in the NW and SE sections of the main building - '''Couch Room and one St. Josephs near a window'''||deinerson1 - '''Done'''|| ||determine which 2 rooms will get a router - '''Apartments 14 and 18'''||deinerson1 - '''Done'''|| ||measure current [[https://wiki.ubuntu.com/Endorphin_Power_Company_Ubuntu_Install_and_Support/wireless_signal_levels|signal details]] using wavemon in key locations||deinerson1 - '''Done'''|| |
Line 10: | Line 16: |
'''The next action date for the EPC project is 3/1/09 Items on the agenda include the following.''' | |
Line 11: | Line 18: |
'''The next action date for the EPC project is 3/1/08 Items on the agenda include the following.''' | * Changed the number of repeating routers to 2, as this is what we are going to try first and add more as needed. |
Line 13: | Line 20: |
* More memory to upgrade the computers to at least 512Mb ('''1 remaining need + 256Mb RDRAM pc800''') * Set up printer and scan station ('''completed gcleric''') * Upgrade all lab PC's to Ubuntu 8.04 LTS (Hardy Heron) ('''completed 12/20/2009''') * Test all systems * Secure cable runs ('''completed gcleric''') * Disable some ttyX virtual terminals on PC's to save memory. - create directory /etc/disabled_eventd<<BR>> - mv tty6 thru tty3 from /etc/evenet.d/ to /etc/disabled_eventd<<BR>> |
* Also removed some of the items that were from the lab setup. |
Items or resources needed
The next action date for the EPC project is 2/7/08 We need the following resources:
resources needed |
responsible party |
2 additional 9dbi antennas |
gcleric - Done |
spool cat5 |
gcleric - Done |
Double sided sticky Velcro |
David Thomas |
light, power extention cords |
jimrz |
update the 3 routers already at EPC |
deinerson1 - Done |
find a suitable location in the NW and SE sections of the main building - Couch Room and one St. Josephs near a window |
deinerson1 - Done |
determine which 2 rooms will get a router - Apartments 14 and 18 |
deinerson1 - Done |
measure current signal details using wavemon in key locations |
deinerson1 - Done |
The next action date for the EPC project is 3/1/09 Items on the agenda include the following.
- Changed the number of repeating routers to 2, as this is what we are going to try first and add more as needed.
- Also removed some of the items that were from the lab setup.
Endorphin_Power_Company_Ubuntu_Install_and_Support/Items (last edited 2009-06-03 03:06:53 by c-68-54-8-56)