Items

Differences between revisions 11 and 23 (spanning 12 versions)
Revision 11 as of 2009-01-14 03:42:23
Size: 917
Editor: c-68-54-8-56
Comment:
Revision 23 as of 2009-06-03 03:06:53
Size: 1232
Editor: c-68-54-8-56
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
||spool cat5||?||
||extention cords||jimrz||
||2 additional 9dbi antennas||gcleric - '''Done'''||
||spool cat5||gcleric - '''Done'''||
||Double sided sticky Velcro||David Thomas||
||light, power extention cords||jimrz||
||update the 3 routers already at EPC||deinerson1 - '''Done'''||
||find a suitable location in the NW and SE sections of the main building - '''Couch Room and one St. Josephs near a window'''||deinerson1 - '''Done'''||
||determine which 2 rooms will get a router - '''Apartments 14 and 18'''||deinerson1 - '''Done'''||
||measure current [[https://wiki.ubuntu.com/Endorphin_Power_Company_Ubuntu_Install_and_Support/wireless_signal_levels|signal details]] using wavemon in key locations||deinerson1 - '''Done'''||
Line 10: Line 16:
'''The next action date for the EPC project is 3/1/09 Items on the agenda include the following.'''
Line 11: Line 18:
'''The next action date for the EPC project is 3/1/08 Items on the agenda include the following.'''  * Changed the number of repeating routers to 2, as this is what we are going to try first and add more as needed.
Line 13: Line 20:
 * More memory to upgrade the computers to at least 512Mb ('''1 remaining need + 256Mb RDRAM pc800''')
 * Set up printer and scan station ('''completed gcleric''')
 * Upgrade all lab PC's to Ubuntu 8.04 LTS (Hardy Heron) ('''completed 12/20/2009''')
 * Test all systems
 * Secure cable runs ('''completed gcleric''')
 * Disable some ttyX virtual terminals on PC's to save memory.

    - create directory /etc/disabled_eventd<<BR>>
    - mv tty6 thru tty3 from /etc/evenet.d/ to /etc/disabled_eventd<<BR>>
 * Also removed some of the items that were from the lab setup.

Items or resources needed

The next action date for the EPC project is 2/7/08 We need the following resources:

resources needed

responsible party

2 additional 9dbi antennas

gcleric - Done

spool cat5

gcleric - Done

Double sided sticky Velcro

David Thomas

light, power extention cords

jimrz

update the 3 routers already at EPC

deinerson1 - Done

find a suitable location in the NW and SE sections of the main building - Couch Room and one St. Josephs near a window

deinerson1 - Done

determine which 2 rooms will get a router - Apartments 14 and 18

deinerson1 - Done

measure current signal details using wavemon in key locations

deinerson1 - Done

The next action date for the EPC project is 3/1/09 Items on the agenda include the following.

  • Changed the number of repeating routers to 2, as this is what we are going to try first and add more as needed.
  • Also removed some of the items that were from the lab setup.