||extention cords||jimrz|| | ||light, power extention cords||jimrz|| ||update the 3 routers already at EPC||deinerson1|| ||find a suitable location in the NW and SE sections of the main building||deinerson1|| ||determine which 4 rooms will get a router||deinerson1|| ||measure current signal details using wavemon in key locations||deinerson1|| |
Items or resources needed
The next action date for the EPC project is 2/7/08 We need the following resources:
resources needed |
responsible party |
spool cat5 |
? |
Double sided sticky Velcro |
David Thomas |
light, power extention cords |
jimrz |
update the 3 routers already at EPC |
deinerson1 |
find a suitable location in the NW and SE sections of the main building |
deinerson1 |
determine which 4 rooms will get a router |
deinerson1 |
measure current signal details using wavemon in key locations |
deinerson1 |
The next action date for the EPC project is 3/1/08 Items on the agenda include the following.
More memory to upgrade the computers to at least 512Mb (1 remaining need + 256Mb RDRAM pc800)
Set up printer and scan station (completed gcleric)
Upgrade all lab PC's to Ubuntu 8.04 LTS (Hardy Heron) (completed 12/20/2009)
- Test all systems
Secure cable runs (completed gcleric)
- Disable some ttyX virtual terminals on PC's to save memory.
- create directory /etc/disabled_eventd
- mv tty6 thru tty3 from /etc/evenet.d/ to /etc/disabled_eventd
Endorphin_Power_Company_Ubuntu_Install_and_Support/Items (last edited 2009-06-03 03:06:53 by c-68-54-8-56)