March

Differences between revisions 1 and 2
Revision 1 as of 2022-03-11 04:57:21
Size: 1859
Editor: rexbouwense
Comment:
Revision 2 as of 2022-03-11 04:58:21
Size: 1858
Editor: rexbouwense
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
#####Describe ArizonaTeam/TeamReports/22/March here. #####Describe ArizonaTeam/TeamReports/22/March here

03 March – Virtual Tempe Ubuntu Hour hosted by Todd Cole
  • • 2 attendees • Discussed data base management

05 March – Virtual AZLOCO/PLUG Installfest/Linux Workshop

  • • 7 attendees • Attempted to repair Big Blue Button software • Discussed replacements options for Big Blue Button • Discussed possible location options for future physical events when such events become an option

06 March – AZLOCO Team Meeting chaired by Todd Cole

10 March – Sierra Vista Ubuntu Hour hosted by Rex Bouwense

  • • 8 attendees • We will be updating or installing Ubuntu 20.04 on four of the Warrior Healing Center’s Operations Center computers on Saturday, 12 March. Volunteers were requested to be there at 1000. • Ubuntu 22-04 is scheduled to be released on 21 April 2022. • Briefly discussed PWAs (Progressive Web Applications) • A member asked if there were any 8 Gb DDR-3 RAM sticks available in our spare parts boxes. He was given what he needed. • A member asked how he could change the size of the icons in Ubuntu. That can be done by choosing settings and then appearance. Select the size that you want from there. • Briefly discussed mlocate and netplanner • Gene presented an update on his power wall project.

10 March – Virtual Phoenix Ubuntu Hour hosted by Todd Cole

  • • 2 attendees

    • Discussed the most recent FireFox update (98.0) • Discussed cloud based operating systems • Briefly discussed Ubuntu Pro

ArizonaTeam/TeamReports/22/March (last edited 2022-03-25 05:22:41 by rexbouwense)